Back to Previous Page

Renovation of PFFS-Downtown Spaces on Schedule

DSC_0163

These photos were taken on 6/23/14. We are on track for renovation completion by 7/14/14.

The renovation of the initial set of  ‘Paulo Freire Freedom School – Downtown’ learning spaces continues through the summer with completion scheduled for 7/14/14.  Upon completion there will be two large learning spaces DSC_0166and two adjoining break-out spaces accommodating 50 inaugural 6th and 7th graders and five full time staff.  There will also be a central adult observation / work space.

When we open on 7/31/14, PFFS-Downtown will be a demonstration site/lab school for best PBL/STEM instructional practices and small school design.   The spaces will be equipped with 21st century technology.  PFFS-Downtown will be the vanguard of the emerging CITY 6-12 STEM Education Complex.

DSC_0165 DSC_0164 DSC_0167
Share on FacebookTweet about this on TwitterPin on PinterestShare on TumblrShare on Google+Share on LinkedIn

Leave a Reply

  • (will not be published)

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>